Methodology for Improvement Capacity Installed in a Production Line of Salted Peanuts

The project focuses on the production capacity analysis in a company that produces salty peanut botanero which currently carries out its activities in a non-industrialized way, omitting the adequate standardization, so it is affected by the demand or the projected objectives in the local market. Acc...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Granich, Gladys, Anaya Pérez, Maria Elena
Médium: Online
Jazyk:spa
Vydáno: Universida de Sonora 2022
On-line přístup:https://epistemus.unison.mx/index.php/epistemus/article/view/165
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
Popis
Shrnutí:The project focuses on the production capacity analysis in a company that produces salty peanut botanero which currently carries out its activities in a non-industrialized way, omitting the adequate standardization, so it is affected by the demand or the projected objectives in the local market. According mentioned and based on its growth and planned demand for the next 5 years, a proposal is prepared in order to meet that objective. The installed capacity could supply 67,410 pieces annually when sales of more than 158,760 pieces were forecast. The comparative analysis carried out between two alternatives related to the acquisition of new machinery or hiring of operators to increase the workforce, to the production area.